Sieyuan 400kV GIS in Korinthos Substation consortium project which cooperated with Greece Transmission System Operator--”IPTO” has sucessfully one-time passed high voltage test on May 28, 2022, this progress marks an important milestone, and it is a critical step for Sieyuan Electric towards EU market. This project is one of the main expansion projects of PELOPONNESE 400kV UHV system, in which Substation Korinthos is the center of the project. After the project is completed, it will eliminate the overload problem of PELOPONNESE's 400kV power grid.
On November 16, 2022, Chinese President Xi Jinping and Indonesian President Widodo jointly witnessed...
At the beginning of October, Sieyuan Electric's AIS products received online supervision from our ...
In June 2022, our company's first 220kV uniform insulation transformer (3 units in batch) was ...
In July, Sieyuan Electric arranged FAT for six capacitor bank projects which was awarded by TNB ...
Sieyuan 400kV GIS in Korinthos Substation consortium project which cooperated with Greece ...
With the further development of Sieyuan Electric's business in the Philippine NGCP, and the ...
Recently, Sieyuan Electric’s 1st GIS Project in Kuwait, totally 156 No.s 145 kV GIS for 12 ...
On February 25, 2022, Sieyuan Electric Experimental Testing Center received the CNAS accreditation ...
This is one of our transformer projects installed in Chile, which is the largest capacity transforme...