800 VDC (also written 800V DC; NVIDIA's 2025 announcement called it 800 V HVDC) is a new approach to powering AI data centers. Medium-voltage AC is converted to 800 V DC just once, in one central substation, and DC runs all the way to the racks. It's designed for AI racks of 1 MW and more, where AC distribution simply can't provide enough copper and adds too many conversion steps.
Why?
It comes down to power per rack. NVIDIA's rack power roadmap goes from about 145 kW per rack, to 330 kW with Vera Rubin, then 570 kW. Beyond 1 MW per rack, NVIDIA moves to 800 VDC.
Today, 415 or 480 VAC goes to each rack, and every rack has to convert it to 54 VDC. That means too much copper, too many conversion steps and too much floor space.
So NVIDIA converts once, further upstream, and sends DC to the racks. The win is big: according to NVIDIA, the same copper conductor carries 157% more power at 800 VDC than at 415 VAC.
NVIDIA describes three approaches to bringing in 800 VDC. We'll focus on the one for new high-density data halls: a central 800 VDC substation that takes a 35 kV class supply and feeds 800 VDC into the data hall. Next, we track the power from the MV supply to the rack, then look at the alternative still under development, the solid-state transformer (SST).
A quick look at the power train
| Stage | Equipment | Current (AC) design | With an 800 VDC substation |
|---|---|---|---|
| 1 | 35 kV supply | MV feeders to the data hall | Same |
| 2 | MV switchgear | Protects and switches each transformer feeder | Same role; now the first section of each ~5 MW 800 VDC substation |
| 3 | Dry-type transformer | Steps MV down to 415/480 VAC for the hall | Steps MV down to the rectifier's AC input |
| 4 | Rectifier | Inside each server's power supply | Rectifier cabinets next to the transformer, in the 800 VDC substation |
| 5 | LV switchgear | AC switchboards and PDUs | 800 VDC switchboard, breakers, disconnectors and busway |
| 6 | Backup (UPS) | AC UPS: rectifier, battery, inverter | Batteries on the 800 VDC bus (DC UPS) |
| 7 | Rack | AC in, converted to 54 VDC | 800 VDC in, stepped down to 54 VDC |
Which option we cover. NVIDIA has three options, and two of them are stepping stones for facilities that want to stay with their existing AC design. In Option A, a power rack next to the compute racks converts AC to DC (about 660 kW per power rack). In Option B, a power center at the end of each row does it, with deployment expected in Q3 2027 at the earliest. In both A and B, the transformer stays in the existing electrical room and feeds the existing LV AC switchgear as usual. This article covers Option C: the 800 VDC substation for new, very high-density data halls. NVIDIA sees its benefits as scalability, modular build, simple operation and long-term infrastructure optimization.
1. The 35 kV supply
Upstream of the data hall, nothing changes. The campus is still connected to the grid through an HV substation with HV power transformers and HV switchgear, and power still flows over medium-voltage feeders to the buildings. (Sieyuan has supplied equipment for today's AC data centers, such as 138 kV power transformers for a data center in Texas, 230 kV dead tank breakers for a US data center switchyard and MV cast-resin dry-type transformers for a 203 MW data center in Thailand.) NVIDIA mentions that many hyperscale AI campuses distribute at 34.5 kV, a common level in North America. In this article we call it 35 kV class.
What has changed is the load the grid sees. GPUs running AI workloads operate in sync, so rack power jumps between roughly 30% and 100% of its rating. On large campuses, these swings reach the point of interconnection. NVIDIA says it first evens them out at rack level, and also indicates that more storage and power conditioning may be needed at the grid interface to meet interconnection requirements.
2. MV switchgear
In an 800 VDC design, MV switchgear does the same job as in an AC one: it switches and protects the feeder to the transformer. The difference is the equipment behind it. NVIDIA's data hall design uses a few large, similar units of about 4.8 MW or more for the conversion from MV to 800 VDC, and calls them power blocks. We refer to one such unit, together with its MV switchgear, as an 800 VDC substation. The power flow is a straight line:
35 kV class supply → MV switchgear → transformer → rectifiers → DC switchboard → 800 VDC to the data hall
It replaces the conventional electrical room full of smaller transformers.

To specify MV switchgear for an 800 VDC substation, consider:
The voltage class: the same as the campus distribution (usually 35 kV class)
Feeder rating and protection settings suited to the substation
Space and installation constraints, if the switchgear goes into a prefabricated enclosure (see section 7)
3. Dry-type transformer (rectifier duty)
In the 800 VDC substation, a line-frequency transformer reduces the MV supply to the AC voltage the rectifier needs. NVIDIA calls the transformer-rectifier combination a Transformer Rectifier Unit (TRU). NVIDIA's reasons for it include mature transformer technology, good fault isolation, familiarity for equipment designers and operators, and a good match with existing 35 kV class distribution. NVIDIA's current thinking is that the TRU is very practical for units of about 5 MW.
Dry-type transformers work well for this application if the transformer sits indoors or in a container next to the rectifier. A transformer supplying a rectifier works harder than one supplying normal AC loads. A rectifier doesn't draw power as a smooth sine wave; it draws it in pulses. These pulses add harmonic currents that produce heat and add to the winding losses. So the transformer has to be designed and tested for use with a rectifier, not just specified as a standard distribution transformer. In North America, the standard is IEEE C57.18.10, which covers semiconductor rectifier transformers for loads of 100 kW and higher, dry-type or liquid-filled. Internationally, IEC 61378-1 is the standard for converter transformers for industrial use, including windings with a 30° phase shift for multi-pulse rectifiers.
A well-known way to build the transformer-rectifier pair is what NVIDIA calls the "Panama" architecture, already used in large industrial and utility systems. Here the transformer is a phase-shifting transformer (dry-type, in this case). Besides isolation and voltage transformation, it has several phase-shifted outputs, each with its own rectifier. Because of the phase shift between the outputs, much of the harmonic current cancels, so the design relies on passive magnetics instead of active power-electronic control.
4. The rectifier
In a traditional AC data center, a small rectifier sits in each server power supply. In an 800 VDC substation, the rectifier becomes a cabinet next to the transformer. The low-voltage side of the transformer connects directly to the rectifiers, and 800 VDC is then sent from the substation to the data hall.
NVIDIA states that a number of rectifier designs are being evaluated for these substations. One builds on the IGBT converters used in large UPS systems. Another puts many high-density versions of rack power shelves in parallel. A third combines a phase-shifting transformer with centralized rectification (the Panama architecture).
5. 800 VDC switchgear and DC protection
From here on, everything is DC: an 800 VDC switchboard, DC breakers or fuses, DC switch-disconnectors, and high-capacity busway to the data hall. In NVIDIA's design, high-capacity DC switchboards and busway handle distribution in the data hall.
This is where it differs most from AC design. A DC fault current has no natural zero crossing to help interrupt it, and all the capacitors on the system discharge into the fault. Protection, grounding and arc-flash rules for 800 VDC data centers are still in the making. The main public reference so far is the OCP LVDC white paper (v1.1.0), which focuses on voltage, polarity, grounding and protection selectivity for low-voltage DC distribution.
When selecting DC switchgear, check:
Rated DC operational voltage (Ue), with margin above 800 VDC, e.g. 1,000 V or 1,500 V DC equipment
Current rating for the busway and feeder sizes
Breaking or short-time withstand capacity for the fault current the source and capacitors can deliver
The approvals the project's market needs (IEC 60947 series, or UL in North America)
6. DC UPS and batteries on the 800 VDC bus
In an AC data center, there is a UPS (uninterruptible power supply) between the LV switchboard and the racks. It converts the AC to DC to charge the batteries, then converts it back to AC for the racks, and each server converts it back to DC again. When the grid fails, the batteries take the load until the generators start up.
At 800 VDC, the power coming out of the rectifiers is already DC. So you can connect batteries to the 800 VDC bus without their own rectifier and inverter. You still need a DC/DC converter, because the battery's voltage goes down as it discharges. The DC/DC converter keeps the bus voltage constant for the IT load. Basically, your UPS is now a DC UPS: battery cabinets with converters and controls. NVIDIA points out that its data hall design makes it easier to integrate DC UPS and battery storage, and we have already seen announcements of battery cabinets that connect directly to the 800 VDC bus.
The same batteries can also help dampen GPU load swings on the DC side, together with the capacitors in the rack.
7. One package: the e-house concept
In NVIDIA's data center design, stages 2 to 5 are not scattered across an indoor electrical room. NVIDIA wants an integrated system, from MV input through the step-down transformer, rectification and 800 VDC switchboard to DC output, in outdoor modular containers. The reasons: prefabrication, factory testing, easier installation on site, less commissioning work and a smaller indoor electrical room.
In industrial and utility projects, this is called an e-house: switchgear, transformers and controls are installed and everything is tested in a prefabricated enclosure before it's shipped. So with an 800 VDC substation, you define the interfaces between the MV switchgear, transformer, rectifier and DC switchgear in the factory, not on site. Then you can replicate the same unit as you expand the campus. NVIDIA adds that this makes it easier to add DC UPS, battery energy storage, renewables and DC microgrids later.
8. At the rack
In the rack, power shelves convert 800 VDC to 54 VDC for today's compute trays. Power shelves of about 90 kW in a 1U format have already been announced for this. The board then converts further, down to chip level. There's also capacitor-based storage in or near the rack to handle the fastest GPU load swings. Moving forward, NVIDIA anticipates native 800 VDC compute racks that take power directly from the facility and convert it as close to the chip as possible.
9. Solid-state transformer (SST) vs transformer-rectifier
A solid-state transformer is a single power-electronic system that replaces both the dry-type transformer and the rectifier cabinets. It takes MV AC to 800 VDC using high-frequency switching and small high-frequency transformers. The potential advantages NVIDIA lists are higher power density, faster dynamic response, better controllability and a smaller footprint.
At 35 kV class, it still has work to do. The MV SSTs announced so far are in pilot programs and technical validation. NVIDIA notes that most SST platforms on the market are designed for about 15 kV-class input. Because many hyperscale campuses distribute at 35 kV class, more development is needed at the higher voltage in insulation coordination, protection, thermal management and utility interconnection.
The rest of the chain is still there, though. An SST-based 800 VDC substation still has MV switchgear before it and DC switchgear after it.
| Transformer + rectifier (TRU) | SST | |
|---|---|---|
| MV switchgear | Required | Required |
| MV to 800 VDC | Line-frequency transformer + rectifier cabinets | Single power-electronic system |
| Maturity | Established components; NVIDIA's near-term route for ~5 MW units | Pilots; mostly ~15 kV-class today |
| Footprint | Larger | Smaller |
| DC switchgear | Required | Required |
10. What this means for new data center projects
800 VDC is moving from white papers to pilots. If you're building a new data hall around 800 VDC substations, the transformer-rectifier route is the one that's compatible with 35 kV class distribution today.
The choice to use 800 VDC needs to be part of the single-line diagram from the start, because you fix things like the MV switchgear, transformers and substation layout early in the project.
Early single-line diagram decisions:
What MV voltage class, and how many 800 VDC substations does the hall need?
What's the rating of each substation? (NVIDIA's reference is about 5 MW)
Transformer-rectifier or SST?
What's your approach to DC protection and grounding?
Packaging: indoor electrical room or prefabricated e-house?
Exploring 800 VDC for a future data center? Talk to our engineers.